Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope for Medium Large Big Dog

  £30.38  £20.25
Save: 33% off
 
  • Model: A01-32962299870
  • 4118 Units in Stock

Please Choose:

Color O



Size O





Add to Cart:   
Type Leashes
Dog Leash Type Basic Leashes
Pattern Striped
Feature Reflective
Season All Seasons
Material Nylon
Color Black, Red, Blue, Green, Pink
Length 150cm/4.92ft
Diameter 1.2cm/0.47inch
For Large Medium-sized Dog
Feature Durable/Heavy Duty

Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope for Medium Large Big Dog

 

  • Material: Nylon
  • Color: Black, Red, Blue, Green, Pink
  • Length 150cm/4.92ft
  • Diameter 1.2cm/0.47inch
  • For Large Medium-sized Dog
  • Durable/Heavy Duty

   

Note:

  • Please allow 1-3cm errors due to manual measurement.
  • As different computers display color differently, the color of the antual item may vary slightly from the above image.